The dam constructed on Murat River within the border of Muş city by investor, Enerjisa, is a clay cored rockfill dam. The project is one of the biggest dams built by private sector with its 2 units of 110 MW and 2 units of 30 MW power of sap turbunes, totally 280 MW installed power of plant and 54,69 km2 of pond area.

The formwork solutions on intake structure, outlet structure and shutter shaft structures taking part within the scope of the project were realized with the utilization of Intek Formwork systems below.

  • Inteva wall formworks
  • ADP adjustable circular wall formwork
  • TTD single sided wall formwork supporting equipments (start-up and climbing phases)
  • HD 150 load bearing tower system