Web sitemizde size en iyi deneyimi sunabilmemiz için çerezleri kullanıyoruz. Sayfamızı ziyarete devam ederek çerez kullanımını onaylamış olacaksınız. Usage and Privacy

Hospitality Consultancy

POM Hospitality Consultancy and Project Management Services offers alternating professional solutions for the investors with respect to development, design and construction phases in hotel projects within scope of Hospitality Consultancy. POM also provides all technical services that are needed from decision-making stage of hotel project to the opening day of the hotel.


Please click on "Offer Request" button below to send your offer and detailed information request to the company for the Hospitality Consultancy product.

Offer Request Add to Panel
Tag:
Architectural project consultancy service Project management
About the Product
1Specifications

• Hotel Brand Integration: Under this consultancy scope, according to selected target group and planned project; most suitable, best performing administration and franchise companies are determined and contracts are signed.
• Architectural Concept Development: Based on preliminary concept reports and Owner/ brand name demands; architectural and interior architectural concepts are identified. Function distribution schemes are created with area programs effectively especially with respect to hotel operation.
• Mechanical& Electrical Concept Development: Mechanical and electrical systems are selected in compliance with relevant technical standards and Owner’s requests so that best performance is achieved. Determination of heat and sound levels, air conditioning, control and automation systems, lighting scenarios, energy saving system solutions are within the scope of this consultancy service.
• Purchase, Planning And Logistics Coordination: Purchase activities are coordinated within the scope of FF&E ve HOE lists that are established in accordance with the standards defined by hotel administration and/or Owner and design groups. Proper and long-lasting products are selected and purchased according to project schedule.

2References

- Bar Montenegro Hotel Project
- Best Western SAW Airport
- Doubletree by Hilton Izmir Airport
- Findikzade Hotel Project
- Four Points by Sheraton Istanbul Pendik
- Golden Tulip Bayrampasa
- Hampton by Hilton Bolu
- Hilton Garden Inn Istanbul Golden Horn
- Kucukcekmece Kervansaray Hotel Project
- Ramada Encore Iskenderun
- Sapanca Hotel Project
- Trabzon Three Pearl Hotel