Please click on "Offer Request" button below to send your offer and detailed information request to the company for the PANEMAX Steel-Framed Crane-Carried Panel Formwork product.
Multi-storey buildings, housing projects, business and shopping centers, hotels and hospitals, cultural buildings, industrial buildings, stadiums, towers, transportation structures, road and bridge projects, water structures
Designed for concrete pressure of 80 kN / m².
No pre-assembly required, ready to use as soon as material arrives on site.
The “special profiles oluşturan that make up the panel frame add strength to the panels and ensure the long life of the panels.
The special frame profile and the special locking system allow the panels to be joined at any point, eliminating the need for holes in the frame to meet each other.
For 3 m height, 3 rows of anchor shafts are sufficient.
A small number of locks are sufficient for panel combinations. This shortens the mold and dismantling labor time.
The slot on the frame profile forms a surface for the seating of the plywood and surrounds the plywood to protect the edges of the plywood from impacts.
21 mm thick plywood is used in the panels.
ISO 9001: 2015
TS EN ISO 3834-3
GOST
* Istanbul New Airport Project
* Zorlu Center Project
* Mausoleum, Mosque, Museum and Library Project
* Mazi Plus Shopping Mall
* Leningradsky Royal Square Project
* Algeria-Albania-Georgia-Prison Project in Turkey